Back to 1999 Production

IDWGP September Production

          

Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1

Z-50

7.32

188.6

0.25

135,809

192,788

0.70

573.2

10.2

98.6

T2

Z-50

6.97

185.2

0.25

133,279

173,434

0.77

574.5

11.5

98.4

T3

Z-50

6.85

176.6

0.24

127,130

166,787

0.76

553.3

48.2

93.3

Avg.

 

7.05

183.5

0.24

132,073

177,669

0.75

567.0

23.3

96.8

Tot.

 

 

 

 

396,219

533,008

 

1,701.0

69.8

 

YTD Production

 

January 1st, 1999 thru

September 30th, 1999

4 706 800  kWHrs

 
 
Back to 1999 Production