
IDWGP September Production
|
Turbine
Name |
Turbine Type |
Average W/S (m/s) |
Average
Power (kW) |
Capacity
Factor |
Total
Energy (kWHrs) |
Expected
Energy (kWHrs) |
Perf.
Ratio |
Online
(Hrs) |
N.Rdy
(Hrs) |
Avlblty
(%) |
|
T1 |
Z-50 |
7.32 |
188.6 |
0.25 |
135,809 |
192,788 |
0.70 |
573.2 |
10.2 |
98.6 |
|
T2 |
Z-50 |
6.97 |
185.2 |
0.25 |
133,279 |
173,434 |
0.77 |
574.5 |
11.5 |
98.4 |
|
T3 |
Z-50 |
6.85 |
176.6 |
0.24 |
127,130 |
166,787 |
0.76 |
553.3 |
48.2 |
93.3 |
|
Avg. |
|
7.05 |
183.5 |
0.24 |
132,073 |
177,669 |
0.75 |
567.0 |
23.3 |
96.8 |
|
Tot. |
|
|
|
|
396,219 |
533,008 |
|
1,701.0 |
69.8 |
|
YTD
Production
|
January
1st, 1999 thru |
September
30th, 1999 |
4 706
800 kWHrs |