Back to 2007 Production

IDWGP September Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWhrs)

Expected

Energy

(kWhrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 7.98 215.1 0.29 154,478 227,014 0.68 644.3 12.3 98.3
T2 Z-50 7.49 184.3 0.25 118,841 179,430 0.66 557.0 106.8 85.2
T3 Z-50 6.30 56.6 0.08 40,282 122,595 0.33 256.5 429.8 40.3
Avg.   7.26 152.0 0.20 104,534 176,346 0.56 486.0 183.0 74.6
Tot.         313,601 529,039 1,457.8 549.0
* IDWGP Monthly Station Power Consumption
September 1st,2007 thru September 30th,2007 1 399

IDWGP Monthly Net Generation

September 1st,2007 thru September 30th,2007 315 000
IDWGP YTD Net Production
January 1st,2007 thru September 30th,2007 3 672 200
** IDWGP Monthly Power Consumption from Grid
September 1st,2007 thru September 30th,2007 2 800
** IDWGP YTD Power Consumption from Grid
January 1st,2007 thru September 30th,2007 12 600

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity. 

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2007 Production