Back to 2005 Production

IDWGP September Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 7.25 140.1 0.19 65,609 117,942 0.56 378.5 290.0 59.7
T2 Z-50 7.29 197.4 0.26 130,304 175,022 0.74 580.7 76.5 89.4
T3 Z-50 7.28 194.9 0.26 128,756 170,567 0.75 585.2 87.2 87.9
Avg.   7.27 177.5 0.24 108,223 154,510 0.69 514.8 151.2 79.0
Tot.         324,669 463,531 1,544.3 453.7
* IDWGP Monthly Station Power Consumption
September 1st,2005 thru September 30th,2005 *** 5 000

IDWGP Monthly Net Generation

September 1st,2005 thru September 30th,2005 345 800
IDWGP YTD Net Production
January 1st,2005 thru September 30th,2005 4 214 000
** IDWGP Monthly Power Consumption from Grid
September 1st,2005 thru September 30th,2005 1 400
** IDWGP YTD Power Consumption from Grid
January 1st,2005 thru September 30th,2005 14 000

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

*** Estimated amount due to data loss.