IDWGP September Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 7.12 175.8 0.23 126,580 181,226 0.70 628.2 0.5 99.9
T2 Z-50 6.90 174.5 0.23 125,646 170,596 0.74 616.5 0.7 99.9
T3 Z-50 6.60 166.5 0.22 119,885 149,999 0.80 613.7 12.0 98.3
Avg.   6.87 172.3 0.23 124,037 167,273 0.74 619.5 4.3 99.4
Tot.         372,111 501,820   1,858.3 13.2  
* IDWGP Monthly Station Power Consumption
September 1st,2002 September 30th,2002 6,711

IDWGP Monthly Net Generation

Sept. 1st,2002 thru September 30th,2002 365,400
IDWGP YTD Net Production
January 1st,2002 thru September 30th,2002 5,206,600
** IDWGP Monthly Power Consumption from Grid
Sept. 1st,2002 thru September 30th,2002 1,400
** IDWGP YTD Power Consumption from Grid
January 1st,2002 thru September 30th,2002 14,000

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.