IDWGP October Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWhrs)

Expected

Energy

(kWhrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 8.47 255.7 0.34 183,104 257,811 0.71 626.2 68.2 90.8
T2 Z-50 8.25 254.0 0.34 181,678 245,888 0.74 617.8 79.2 89.4
T3 Z-50 7.24 136.5 0.18 97,549 185,555 0.53 441.8 209.5 71.8
Avg.   7.99 215.4 0.29 154,110 229,751 0.66 562.0 119.0 84.0
Tot.         462,331 689,254 1,685.8 356.8
* IDWGP Monthly Station Power Consumption
October 1st,2007 thru October 31st,2007 6 669

IDWGP Monthly Net Generation

October 1st,2007 thru October 31st,2007 469 000
IDWGP YTD Net Production
January 1st,2007 thru October 31st,2007 4 141 200
** IDWGP Monthly Power Consumption from Grid
October 1st,2007 thru October 31st,2007 0
** IDWGP YTD Power Consumption from Grid
January 1st,2007 thru October 31st,2007 12 600

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity. 

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2007 Production