Back to 2005 Production

IDWGP October Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 6.70 105.5 0.14 78,502 161,819 0.49 354.7 235.0 68.4
T2 Z-50 6.98 180.9 0.24 134,559 195,610 0.69 596.3 36.3 95.1
T3 Z-50 6.87 152.2 0.20 113,127 172,865 0.65 510.7 155.5 79.1
Avg.   6.85 146.2 0.19 108,729 176,765 0.61 487.2 142.3 80.9
Tot.         326,188 530,295 1,461.7 426.8
* IDWGP Monthly Station Power Consumption
October 1st,2005 thru October 31st,2005 4 188

IDWGP Monthly Net Generation

October 1st,2005 thru October 31st,2005 322 000
IDWGP YTD Net Production
January 1st,2005 thru October 31st,2005 4 536 000
** IDWGP Monthly Power Consumption from Grid
October 1st,2005 thru October 31st,2005 1 400
** IDWGP YTD Power Consumption from Grid
January 1st,2005 thru October 31st,2005 15 400

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

 

Back to 2005 Production