
IDWGP November Production
|
Turbine
Name |
Turbine Type |
Average W/S (m/s) |
Average
Power (kW) |
Capacity
Factor |
Total
Energy (kWHrs) |
Expected
Energy (kWHrs) |
Perf.
Ratio |
Online
(Hrs) |
N.Rdy
(Hrs) |
Avlblty
(%) |
|
T1 |
Z-50 |
8.2 |
294.2 |
0.39 |
209,802 |
246,465 |
0.85 |
598.2 |
41.7 |
94.2 |
|
T2 |
Z-50 |
8.11 |
281.1 |
0.37 |
202,391 |
246,032 |
0.82 |
602.5 |
13.7 |
98.1 |
|
T3 |
Z-50 |
8.02 |
286.3 |
0.38 |
205,796 |
236,283 |
0.87 |
619.2 |
9.0 |
98.8 |
|
Avg. |
|
8.11 |
287.2 |
0.38 |
205,997 |
242,927 |
0.85 |
606.7 |
21.5 |
97.0 |
|
Tot. |
|
|
|
|
617,990 |
728,780 |
|
1,819.8 |
64.3 |
|
YTD Production
|
January
1st, 1999 thru |
November
30th, 1999 |
5 965 730
kWHrs |