Back to 2004 Production

IDWGP November Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 7.82 242.6 0.32 174,636 221,609 0.79 659.3 0.8 99.9
T2 Z-50 7.57 226.5 0.30 163,047 210,569 0.77 660.7 1.3 99.8
T3 Z-50 7.17 221.8 0.30 157,206 179,955 0.87 635.0 32.8 95.4
Avg.   7.52 230.3 0.31 164,963 204,044 0.81 651.7 11.7 98.4
Tot.         494,890 612,132   1955.0 35.0
* IDWGP Monthly Station Power Consumption
November 1st,2004 thru November 30th,2004 6 290

IDWGP Monthly Net Generation

November 1st,2004 thru November 30th,2004 488 600
IDWGP YTD Net Production
January 1st,2004 thru November 30th,2004 4 918 200
** IDWGP Monthly Power Consumption from Grid
November 1st,2004 thru November 30th,2004 1 400
** IDWGP YTD Power Consumption from Grid
January 1st,2004 thru November 30th,2004 16 800

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2004 Production