Back to 2006 Production

IDWGP May Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWhrs)

Expected

Energy

(kWhrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 9.28 310.4 0.41 230,890 305,409 0.76 711.8 0.7 99.9
T2 Z-50 8.94 292.8 0.39 217,855 283,477 0.77 689.5 25.0 96.6
T3 Z-50 8.87 312.5 0.42 232,488 278,368 0.84 712.0 1.3 99.8
Avg.   9.03 305.2 0.41 227,077 289,085 0.79 704.5 9.0 98.8
Tot.         681,232 867,254 2,113.3 27.0
* IDWGP Monthly Station Power Consumption
May 1st,2006 thru May 31st,2006 568

IDWGP Monthly Net Generation

May 1st,2006 thru May 31st,2006 681 800
IDWGP YTD Net Production
January 1st,2006 thru December 31st,2006 3 357 200
** IDWGP Monthly Power Consumption from Grid
May 1st,2006 thru May 31st,2006 2 800
** IDWGP YTD Power Consumption from Grid
January 1st,2006 thru December 31st,2006 8 400

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity. 

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2006 Production