Back to 2005 Production

IDWGP May Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 9.13 311.3 0.42 231,569 287,490 0.81 710.7 33.7 99.5
T2 Z-50 8.97 295.2 0.39 219,596 281,302 0.78 710.7 3.5 99.5
T3 Z-50 8.58 284.0 0.38 211,132 260,355 0.81 691.0 24.3 96.7
Avg.   8.89 296.8 0.40 220,766 276,383 0.80 704.2 10.5 98.6
Tot.         662,297 829,148 2,112.3 31.5
* IDWGP Monthly Station Power Consumption
May 1st,2005 thru May 31st,2005 7 097

IDWGP Monthly Net Generation

May 1st,2005 thru May 31st,2005 655 200
IDWGP YTD Net Production
January 1st,2005 thru May 31st,2005 2 928 800
** IDWGP Monthly Power Consumption from Grid
May 1st,2005 thru May 31st,2005 1 400
** IDWGP YTD Power Consumption from Grid
January 1st,2005 thru May 31st,2005 7 000

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2005 Production