Back to 2003 Production

IDWGP May Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 8.05 226.5 0.30 168,518 224,365 0.75 633.5 22.5 97.0
T2 Z-50 7.93 236.5 0.32 175,981 217,592 0.81 646.3 9.7 98.7
T3 Z-50 7.51 226.8 0.30 168,726 198,284 0.85 651.7 16.7 97.8
Avg.   7.83 229.9 0.31 171,075 213,414 0.80 643.8 16.3 97.8
Tot.         513,225 640,241   1,931.5 48.8  
* IDWGP Monthly Station Power Consumption
May 1st,2003 April 31st,2003 825

IDWGP Monthly Net Generation

May 1st,2003 thru May 31st,2003 512,400
IDWGP YTD Net Production
January 1st,2003 thru May 31st,2003 3,106,600
** IDWGP Monthly Power Consumption from Grid
May 1st,2003 thru May 31st,2003 2,800
** IDWGP YTD Power Consumption from Grid
January 1st,2003 thru May 31st,2003 7,000

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2003 Production