Back to 2002 Production

IDWGP May Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 9.11 299.4 0.40 222,173 282,754 0.79 652.5 43.0 94.2
T2 Z-50 9.05 307.4 0.41 227,767 278,549 0.82 670.2 16.3 97.8
T3 Z-50 8.46 294.5 0.39 218,197 249,306 0.88 675.3 20.5 97.2
Avg.   8.87 300.4 0.40 222,712 270,203 0.83 666.0 26.7 96.4
Tot.         668,137 810,609   1,998.0 79.8  
* IDWGP Monthly Station Power Consumption
May 1st,2002 May 31st,2002 1737

IDWGP Monthly Net Generation

May 1st,2002 thru May 31st,2002 666,400
IDWGP YTD Net Production
January 1st,2002 thru May 31st,2002 3,659,600
** IDWGP Monthly Power Consumption from Grid
May 1st,2002 thru May 31st,2002 1,400
** IDWGP YTD Power Consumption from Grid
January 1st,2002 thru May 31st,2002 7000

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2002 Production