IDWGP July Production

 

Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 6.91 193.6 0.26 141,481 180,869 0.78 522.0 24.5 96.7
T2 Z-50 6.53 174.9 0.23 127,561 161,924 0.79 491.8 35.7 95.2
T3 Z-50 6.69 187.6 0.25 137,399 169,068 0.81 521.8 26.8 96.4
Avg.   6.71 185.3 0.25 135,480 170,620 0.79 511.8 29.0 96.1
Tot.         406,441 511,861   1,535.7 87.0  

YTD Production

January 1st, 1999 thru July 31st, 1999 4 027 800 kWHrs