Back to 2005 Production

IDWGP July Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 6.59 145.4 0.19 108,167 158,207 0.68 620.0 3.3 99.6
T2 Z-50 6.30 136.1 0.18 101,178 144,465 0.70 603.5 20.0 97.3
T3 Z-50 6.11 141.7 0.19 105,393 132,510 0.80 618.8 8.3 98.9
Avg.   6.33 141.1 0.19 104,913 145,061 0.73 614.2 10.5 98.6
Tot.         314,738 435,182 1,842.3 31.7
* IDWGP Monthly Station Power Consumption
July 1st,2005 thru July 31st,2005 5 338

IDWGP Monthly Net Generation

July 1st,2005 thru July 31st,2005 309 400
IDWGP YTD Net Production
January 1st,2005 thru July 31st,2005 3 668 000
** IDWGP Monthly Power Consumption from Grid
July 1st,2005 thru July 31st,2005 1 400
** IDWGP YTD Power Consumption from Grid
January 1st,2005 thru July 31st,2005 9 800

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2005 Production