IDWGP July Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 5.39 92.9 0.12 66,724 96,653 0.69 533.3 29.5 96.0
T2 Z-50 5.23 88.3 0.12 63,358 92,825 0.68 528.0 28.3 96.2
T3 Z-50 4.96 86.5 0.12 57,809 72,148 0.80 472.3 117.8 84.2
Avg.   5.20 89.3 0.12 62,630 87,209 0.72 511.2 58.5 92.1
Tot.         187,891 261,626   1,533.7 175.7  
                     
* IDWGP Monthly Station Power Consumption
July 1st,2004 thru July 31st,2004 3 909

IDWGP Monthly Net Generation

July 1st,2004 thru July 31st,2004 191 800
IDWGP YTD Net Production
January 1st,2004 thru July 31st,2004 3 199 000
** IDWGP Monthly Power Consumption from Grid
July 1st,2004 thru July 31st,2004 2 800
** IDWGP YTD Power Consumption from Grid
January 1st,2004 thru July 31st,2004 11 200

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.