Back to 2002 Production

IDWGP July Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 6.38 138.7 0.18 103,202 150,135 0.69 606.7 0.5 99.9
T2 Z-50 6.12 132.3 0.18 98,418 138,966 0.71 562.7 33.3 99.5
T3 Z-50 5.68 122.8 0.16 91,160 115,704 0.79 551.0 75.2 89.9
Avg.   6.06 131.3 0.18 97,593 134,935 0.73 573.5 36.3 95.1
Tot.         292,780 404,806   1,720.3 109.0  
* IDWGP Monthly Station Power Consumption
July 1st,2002 July 31st,2002 2,980

IDWGP Monthly Net Generation

July 1st,2002 thru July 31st,2002 289,800
IDWGP YTD Net Production
January 1st,2002 thru July 31st,2002 4,533,200
** IDWGP Monthly Power Consumption from Grid
July 1st,2002 thru July 31st,2002 1,400
** IDWGP YTD Power Consumption from Grid
January 1st,2002 thru July 31st,2002 9,800

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2002 Production