Back to 2005 Production

IDWGP February Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 7.79 258.2 0.34 173,525 210,,768 0.82 599.5 1.3 99.8
T2 Z-50 7.44 235.7 0.31 158,371 196,080 0.81 603.3 1.0 99.9
T3 Z-50 7.23 234.6 0.31 157,628 179,130 0.88 607.5 1.2 99.8
Avg.   7.49 242.8 0.32 163,175 195,326 0.84 603.5 1.2 99.8
Tot.         489,524 585,978 1,810.3 3.5
* IDWGP Monthly Station Power Consumption
February 1st,2005 thru February 28th,2005 3 724

IDWGP Monthly Net Generation

February 1st,2005 thru February 28th,2005 485 800
IDWGP YTD Net Production
January 1st,2005 thru December 31st,2005 1 037 400
** IDWGP Monthly Power Consumption from Grid
February 1st,2005 thru February 28th,2005 1 400
** IDWGP YTD Power Consumption from Grid
January 1st,2005 thru December 31st,2005 2 800

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2005 Production