Back to 2004 Production

IDWGP February Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 8.84 220.4 0.29 153,424 273,246 0.56 662.0 0.0 100.0
T2 Z-50 8.72 333.7 0.44 232,260 269,006 0.86 660.8 0.0 100.0
T3 Z-50 8.28 327.7 0.44 228,089 239,044 0.95 662.5 0.0 100.0
Avg.   8.61 294.0 0.39 204,591 260,432 0.79 661.8 0.0 100.0
Tot.         613,773 781,296   1,985.3 0.0  
* IDWGP Monthly Station Power Consumption
February 1st,2004 thru February 29th,2004 11,773

IDWGP Monthly Net Generation

February 1st,2004 thru February 29th,2004 602,000
IDWGP YTD Net Production
January 1st,2004 thru February 29th,2004 1,083,600
** IDWGP Monthly Power Consumption from Grid
February 1st,2004 thru February 29th,2004 1,400
** IDWGP YTD Power Consumption from Grid
January 1st,2004 thru February 29th,2004 2,800

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2004 Production