Back to 2004 Production

IDWGP August Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 6.19 121.1 0.16 89,884 130,866 0.69 617.0 19.3 97.4
T2 Z-50 6.05 120.8 0.16 89,668 128,410 0.70 627.8 3.8 99.5
T3 Z-50 5.75 127.5 0.17 94,639 108,650 0.87 633.5 4.3 99.4
Avg.   6.00 123.2 0.16 91,397 122,642 0.75 626.2 9.2 98.8
Tot.         274,192 367,926   1878.3 27.5  
                     
* IDWGP Monthly Station Power Consumption
August 1st,2004 thru August 31st,2004 6 792

IDWGP Monthly Net Generation

August 1st,2004 thru August 31st,2004 267 400
IDWGP YTD Net Production
January 1st,2004 thru August 31st,2004 3 466 400
** IDWGP Monthly Power Consumption from Grid
August 1st,2004 thru August 31st,2004 1 400
** IDWGP YTD Power Consumption from Grid
January 1st,2004 thru August 31st,2004 12 600

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2004 Production