Back to 2002 Production

IDWGP August Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 6.63 14939 0.20 108,833 155,699 0.70 611.8 21.2 97.2
T2 Z-50 6.34 149.6 0.20 108,619 144,308 0.75 595.3 22.7 97.0
T3 Z-50 5.99 133.8 0.18 97,153 124,171 0.78 601.8 38.7 94.8
Avg.   6.32 144.4 0.19 104,868 141,393 0.74 603.0 27.5 96.3
Tot.         314,605 424,178   1,809.0 82.5  
* IDWGP Monthly Station Power Consumption
August 1st,2002 August 31st,2002 6,605

IDWGP Monthly Net Generation

August 1st,2002 thru August 31st,2002 308,000
IDWGP YTD Net Production
January 1st,2002 thru August 31st,2002 4,841,200
** IDWGP Monthly Power Consumption from Grid
August 1st,2002 thru August 31st,2002 2,800
** IDWGP YTD Power Consumption from Grid
January 1st,2002 thru August 31st,2002 12,600

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2002 Production