Back to 2004 Production

IDWGP April Production

IDWGP Gross Production Table
Turbine

Name

Turbine

Type

Average

W/S

(m/s)

Average

Power

(kW)

Capacity

Factor

Total

Energy

(kWHrs)

Expected

Energy

(kWHrs)

Perf.

Ratio

Online

(Hrs)

N.Rdy

(Hrs)

Avlblty

(%)

T1 Z-50 8.75 184.7 0.25 128,628 250,786 0.51 607.5 38.5 94.7
T2 Z-50 8.57 285.1 0.38 198,515 246,712 0.80 599.0 43.3 94.0
T3 Z-50 8.18 297.1 0.40 206,879 227,355 0.91 609.0 37.7 94.8
Avg.   8.50 255.6 0.34 178,007 241,618 0.74 605.2 39.8 94.5
Tot.         534,022 724,853   1815.5 119.5  
* IDWGP Monthly Station Power Consumption
April 1st,2004 thru April 30th,2004 6,378

IDWGP Monthly Net Generation

April 1st,2004 thru April 30th,2004 540,400
IDWGP YTD Net Production
January 1st,2004 thru April 30th,2004 2,224,600
** IDWGP Monthly Power Consumption from Grid
April 1st,2004 thru April 30th,2004 1,400
** IDWGP YTD Power Consumption from Grid
January 1st,2004 thru April 30th,2004 5,600

* Power consumed by the Wind Farm when the Turbines are on-line and producing electricity.

** Power consumed by the Wind Farm when the Turbines are off-line. This power is feed in to the Turbines from the Grid.

Back to 2004 Production